LM Site Map
Emergency Contact Numbers:
(970) 248-6070 or (877) 695-5322
LM Home > LM Sites > Colorado

Key Documents and Links   

All documents are Adobe Acrobat files. pdf_icon  

 

Key Documents

Fact Sheet
Data Validation Package-May 2013 Groundwater and Surface Water Sampling 
Deed Restriction
Final Rulison Path Forward 
Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2013   
Monitoring Plan 

Internal Links

Tritium Transport Model
Natural Gas Well Monitoring Results

External Links

Office of Scientific & Technical Information (OSTI)
OSTI Energy Citations Database
OSTI Information Bridge

Please be green. Do not print these documents unless absolutely necessary.
Request a paper copy of any document by submitting a Document Request.


All Site Documents

All documents are Adobe Acrobat files. pdf_icon  

Fact Sheet

Rulison, Colorado, Site Fact Sheet June 23, 2010

Annual Water Sampling and Analysis

Annual Water Sampling and Analysis, Calendar Year 2004:Rulison Test Site Area
EPA-402-R-04-006
November 2004
Annual Water Sampling and Analysis, Calendar Year 2003: Rulison Test Site Area
EPA-402-R-94-001
January 2004
Annual Water Sampling and Analysis, Calendar Year 2002: Rulison Test Site Area 
EPA-402-R-02-007
November 2002
Annual Water Sampling and Analysis, Calendar Year 2001: Rulison Test Site Area   
EPA-402-R-02-002
February 2002
Annual Water Sampling and Analysis, Calendar Year 2000: Rulison Test Area 
EPA-402-R-01-002
February 2001
Annual Water Sampling and Analysis Calendar Year 1999: Rulison Test Area
EPA-402-R-99-012
December 1999
Data Validation Package
May 2013 Groundwater and Surface Water Sampling at the Rulison, Colorado, Site
LMS/RUL/S00513
October 2013
May 2012 Groundwater and Surface Water Sampling at the Rulison, Colorado, Site
LMS/RUL/S00512
November 2012
May 2011 Groundwater and Surface Water Sampling at the Rulison, Colorado Site
LMS/RUL/S00511
December 2011 
May 2010 Groundwater and Surface Water Sampling at the Rulison, Colorado, Site
LMS/RUL/S00510
December 2010
May 2009 Groundwater and Surface Water Sampling at the Rulison, Colorado, Site
LMS/RUL/S00509
February 2014

Groundwater Monitoring Reports

Rulison Site Semiannual Groundwater Monitoring Report 
DOE/NV-521; UC-700
September 1998
Rulison Site Groundwater Monitoring Report Fourth Quarter, 1997
DOE/NV-460; UC-700
February 1998
Rulison Site Groundwater Monitoring Report Third Quarter, 1997
DOE/NV-460; UC-700
October 1997
Rulison Site Groundwater Monitoring Report Second Quarter, 1997
DOE/NV-460; UC-700
August 1997
Rulison Site Groundwater Monitoring Report Fourth Quarter, 1996
DOE/NV-460; UC-700
April 1997
Rulison Site Groundwater Monitoring Report Third Quarter, 1996 
DOE/NV-460; UC-700
February 1997
Rulison Site Groundwater Monitoring Report First and Second Quarters, 1996
DOE/NV-460; UC-700
November 1996

Hydrological/Geological Studies

Radiochemical Analyses of Water Samples from Selected Streams, Wells, Springs and Precipitation Collected Prior to Re-Entry Drilling, Project Rulison-6 
Hydrological/Geological Studies Book 1; HGS7
1971
Radiochemical Analyses of Water From Selected Streams, Springs, and Precipitation Collected During Reentry Drilling, Project Rulison-7
USGS-474-101; Hydrological/Geological Studies Book 1; HGS8
1971
Radiochemical Analyses of Water Samples from Selected Streams and Precipitation Collected in Connection with Calibration-Test Flaring of Gas From Test Well, August 15-October 13, 1970, Project Rulison-8 
USGS-474-107; Hydrological/Geological Studies Book 1; HGS9
1971
Radiochemical Analyses of Water Samples from Selected Streams and Precipitation Collected October 23-November 9, 1970 in Conjunction with the First Production Test, Project Rulison-9 
USGS-474-108; Hydrological/Geological Studies Book 1; HGS10
1971

Long-Term Hydrologic Monitoring Program Sampling and Analysis Results

Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2013  November 26, 2013
Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2012 December 6, 2012
Rulison Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2011  May 10, 2012
Rulison Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2010 January 10, 2011
Rulison Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2009 January 21, 2010
Rulison, Colorado Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2008 December 15, 2008

Monitoring Reports

Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1996
EPA-402-R-97-015
August 1997
Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1992
EPA 600/R-94/209
January 1993
Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1991
EPA 600/R-931/141
January 1992
Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1990 
EPA 600/4-91/030; DOE/DP00593-063
undated
Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1989
EPA/600/4-90/016; DOE/DP00539-062
May 1990
Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1988
EPA-600/4-89/019; DOE/DP/00539-061
May 1989
Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1987
EPA/500/4-88/021; DOE/DP/00539/060
June 1988
Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1986
EPA-600/4-87-017; DOE/DP/00539/058
May 1987
Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1985
EPA/600/4-86/022; DOE/DP/00539/056
April 1986
Off-Site Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1984
EPA-600 4-85-035; DOE DP 0539-055
April 1985
Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1983
EPA-600/4-84-040; DOE/DP/0539-051
July 1984
Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1982
EPA-600/4-83-032; DOE/DP/0539-048
July 1983
Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1981
EPA-600/4-82-061; DOE/DP/00539-046
August 1982
Offsite Environmental Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1980
EPA-600/4-81-047; DOE/DP/00539-043
June 1981
Offsite Environmental Monitoring Report for the Nevada Test Site and Other Test Areas Used for Underground Nuclear Detonations January through December 1979 
EMSL-LV-0539-36
April 1980
Off-Site Environmental Monitoring Report for the Nevada Test Site and Other Test Areas Used for Underground Nuclear Detonations January through December 1978
EMSL-LV-0539-31
October 1979
Off-Site Environmental Monitoring Report for the Nevada Test Site and Other Test Areas Used for Undergound Nuclear Detonations January through December 1977 
EMSL-LV-0539-18
July 1978
Off-Site Environmental Monitoring Report for the Nevada Test Site and Other Areas Used for Underground Nuclear Detonations January through December 1977 
EMSL-LV-0539-12
May 1977
Environmental Monitoring Report for the Nevada Test Site and Other Test Areas Used for Underground Nuclear Detonations January through December 1975
EMSL-LV-539-4
April 1976
Environmental Monitoring Report for the Nevada Test Site and Other Test Areas Used for Underground Nuclear Detonations January through December 1974 
NERC-LV-539-39
May 1975
Environmental Monitoring Report for the Nevada Test Site and Other Test Areas Used for Underground Nuclear Detonations January through December 1973
NERC-LV-539-31
May 1974
Environmental Monitoring Report for the Nevada Test Site and Other Test Areas Used for Underground Nuclear Detonations January-December 1972   
NERC-LV-539-23
May 1973

Natural Gas Wells Monitoring Results

Monitoring Results Natural Gas Wells Near Project Rulison Second Quarter 2014
Monitoring Results Natural Gas Wells Near Project Rulison First Quarter 2014
Monitoring Results Natural Gas Wells Near Project Rulison Third Quarter 2013
Monitoring Results Natural Gas Wells Near Project Rulison Second Quarter 2013
Monitoring Results Natural Gas Wells Near Project Rulison 4th Quarter 2012 and 1st Quarter 2013
Monitoring Results Natural Gas Wells Near Project Rulison   3rd Quarter 2012
Monitoring Results for Natural Gas Wells Near Project Rulison 2nd Quarter 2012
Monitoring Results for Natural Gas Wells Near Project Rulison 1st Quarter 2012 
Monitoring Results for Natural Gas Wells Near Project Rulison 4th quarter 2011
Monitoring Results for Natural Gas Wells Near Project Rulison   3rd quarter 2011
Project Rulison Monitoring Results for Water Vapor in Gas at the Holmes Mesa Compressor Station, Garfield County, Colorado 3rd quarter 2011
Monitoring Results for Natural Gas Wells Near Project Rulison Second Quarter 2011 2nd quarter 2011
Project Rulison Monitoring Results for Water Vapor in Gas at a Natural Gas Compressor Station Homes Mesa, Garfield County, Colorado 2nd quarter 2011
Monitoring Results for Natural Gas Wells Near Project Rulison First Quarter 2011 1st quarter 2011
Project Rulison Monitoring Results for Separated Water at a Natural Gas Plant, Parachute, Colorado 4th quarter 2010
Monitoring Results Natural Gas Wells Near the Project Rulison Horizon 4th quarter 2010
Monitoring Results Natural Gas Wells near the Project Rulison Horizon 3rd quarter 2010
Monitoring Results Natural Gas Wells Near Project Rulison 1st quarter 2009
Fourth Quarter 2008 Report Operational and Environmental Monitoring Within a Three-Mile Radius of Project Rulison. URS. March 2009. 4th quarter 2008
Third Quarter 2008 Report Operational and Environmental Monitoring Within a Three-Mile Radius of Project Rulison. URS. March 2009. 3rd quarter 2008
First Quarter 2008 Report Operational and Environmental Monitoring Within a Three-Mile Radius of Project Rulison. URS. August 2008. 1st quarter 2008
Rulison Monitoring Results Noble Energy Well BM 35-21D July 22, 2008
Rulison Monitoring Results Noble Energy Well BM 36-13D July 22, 2008
Rulison Monitoring Results Noble Energy Well BM 26-24D July 22, 2008
Rulison Monitoring Results Noble Energy Well BM 26-42 May 28, 2008
Rulison Monitoring Results Noble Energy Well BM 35-12 May 28, 2008
Rulison Monitoring Results Noble Energy Well BM 35-21D May 28, 2008
Rulison Monitoring Results Noble Energy Well BM 35-32A May 28, 2008
Rulison Monitoring Results Noble Energy Well BM 36-13   May 28, 2008
Rulison Monitoring Results Noble Energy Well BM 35-21D October 31, 2007
Rulison Monitoring Results Noble Energy Well BM 36-13 October 31, 2007
Rulison Monitoring Results Noble Energy Well BM 35-12   August 15, 2007
Rulison Monitoring Results Noble Energy Well BM 35-32A August 15 and 20, 2007

Tritium Transport Model

Update of Tritium Transport Calculations for the Rulison Site: Report of Activities and Results During 2009-2010

September 2010
Tritium Transport Model Rulison, Colorado, Site Fact Sheet April 27, 2009
Addendum: Tritium Transport at the Rulison Site, a Nuclear-stimulated Low-permeability Natural Gas Reservoir January 2009
Tritium Transport Model Comments and Responses: Gateway Enterprises  October 30, 2007
Tritium Transport at the Rulison Site, a Nuclear-Stimulated Low-Permeability Natural Gas Reservoir 
DOE/NV/13809-54; DOE M/1522 2007
September 2007

Tritium Transport Through a Low-Permeability Natural Gas Reservoir

May 2006
Tritium Transport Model Comments and Responses: Colorado Department of Public Health undated
Tritium Transport Model Comments and Responses: Colorado Oil and Gas Conservation Commission undated

Other Reports

Screening Assessment of Potential Human-Health Risk from Future Natural-Gas Drilling Near Project Rulison in Western Colorado
LMS/RUL/S08087. Publication No. 45237
February 2011
Rulison Monitoring Plan 
LMS/RUL/S06178
July 2010
Final Rulison Path Forward 
LMS/RUL/S04617
June 2010
Rulison Site U.S. Department of Energy Office of Legacy Management-Presentation to Colorado Oil and Gas Conservation Commission July 15, 2009
Rulison Site-Presentation to Colorado Oil and Gas Conservation Commission October 2, 2007
Rulison Site Environmental Management End State Vision Final 
DOE/NV-950
January 2005
Subsurface Site Characterization Work Plan for the Rulison Site, Colorado
DOE/NV-1009
October 2004
Scoping Analysis of Gas Phase Transport from the Rulison Underground Nuclear Test (Letter Report) May 6, 2004
Modeling Approvach for Evaluating Radionuclide Transport in Nuclear-Stimulated Gas Reservoirs 
DOE/NV/13609-15
September 2001
Surface Closure Report Rulison Site 
Letter from State of Colorado to DOE Nevada Operations Office
September 9, 1998
Rulison Site Surface Closure Report
DOE/NV-510; UC-700
July 1998
Project Rulison Study Colorado Oil and Gas Conservation Commission May 6, 1998
CERCLA Preliminary Assessment of DOE's Nevada Operations Office Nuclear Weapons Testing Areas, Volume I  
Preliminary Studies/Background; Book 1; P 2
April 1998
CERCLA Preliminary Assessment of DOE's Nevada Operations Office Nuclear Weapons Testing Areas Volume II 
Preliminary Studies/Background; Book 1; P 3
April 1998
Assessment of Hydrologic Transport of Radionuclides from the Rulison Underground Nuclear Test Site, Colorado
DOE/NV/11508-17; UC-703
September 1996
Rulison Site Corrective Action Report
DOE/NV-453; UC-700
September 1996
Preliminary Site Characterization Report Rulison Site, Colorado
ITLV/10972-177; UC-700
August 1996
Rulison Drilling Effluent Pond Site Long-Term Groundwater Monitoring Plan  
DOE/NV-441; UC-700
July 1996
Verification Sampling and Analysis Plan for Sediment and Water Sampling Rulison Drilling Effluent Pond  
DOE/NV-442; UC-700
July 1996
An Aerial Radiological Survey of Project Rulison and Surrounding Area
EGG 11265-11094; UC-702
August 1995
Surface Radioactivity at the Plowshare Gas-Stimulation Test Sites: Gasbuggy, Rulison, Rio Blanco 
EPA 600/R-05/002
January 1995
A Class III Cultural Resources Survey of the U.S. Department of Energy Rulison Gas Stimulation Test Site Garfield County, Colorado 
DOE/NV/10972-62
December 1993
Floodplains and Wetlands Survey Results for the Rulison and Rio Blanco Sites, Colorado 
DOE/NV/10972-59
December 1993
Sensitive Species Survey Results for the Rulison and Rio Blanco Sites, Colorado 
DOE/NV/10972-55
December 1993
Operational Area Monitoring Plan for the Long-Term Hydrological Monitoring Program Off The Nevada Test Site   October 23, 1991
Evaluation of Groundwater Monitoring at Offsite Nuclear Test Areas
DOE/NV/10845-07; UC-703
March 1991
Hazardous Waste Installation Assessment Report 
DOE/NV/10327-23
May 1986
Multi-Well Experiment MWX-3 As-Built Report  
UC-92a; SAND84-7132; Wells; Book 1; W1
May 1984
Long-Term Hydrologic Monitoring Program Rulison Event Site Grand Valley, Colorado
NVO-273
January 1984
Project Rulison Well Plugging and Abandonment Final Report 
NVO-187
September 1997
Rulison Radiation Contamination Clearance Report June 1977
Off-Site Radiological Safety Program for Project Rulison Flaring, Phase III 
EMSL-LV-539-8
November 1976
Deed Restriction September 11, 1976
Project Rulison Well Plugging and Site Abandonment Plan
NVO-174
May 1976
Status Report on the Three Nuclear Experiments For Stimulation of Tight Gas Sands February 16, 1976
Off-Site Surveillance Activities of the National Environmental Research Center from July through December 1970
NERC-LV-539-17
February 1974
Project Rulison On-Site Radiological Programs During Reentry Drilling Through Production Testing Final Report
NVO-294-5
December 1973
Rulison Site Cleanup Report
NVO-136 (This file replaces preliminary versions from
9/1972 and 2/1973.)
September 1973
Project Rulison Manager's Report 
NVO-71; Historical Information H.1 General; Book 7; HG 20
April 1973
Statistical Correlation of Observed Ground Motion with Low-Rise Building Damage: Project Rulison 
Historical Information H.6 Seismic/Ground Motion Activity; Book 3; HSG 15
 January 1973
Project Rulison Phase II Final Report 
PNE-R-60; Historical Information H.1 General; Book 7; HG 21
 December 28, 1972
Project Rulison Radiological Operations Rollup Plan July 1972
Yield Escalation Evaluation - Project Rulison 
PNE-R-41
June 15, 1972
Earthquake Resistance of Earth and Rock-Fill Dams Analysis of Response of Rifle Gap Dam to Project Rulison Underground Nuclear Detonation June 1972
Project Rulison Summary Report Post-Shot Activities and Programs April 1972
Project Rulison Final Operational Radioactivity Report Production Tests 
NVO-112
February 1972
Permeability of Mesaverde Sandstone Samples: Project Rulison
UCID-16243
March 1, 1972
Chemical Analysis of Pre-Shot Rock from the Rulison Experiment 
UCID-15943; Historical Information H.4 Pre-Event Reports; Book 1; HPR 1
December 14, 1971
Gas Analysis Results for Project Rulison Production Testing Samples 
TID-4500, UC-4
November 29, 1971

Project Rulison - Summary of Results and Analyses 
Historical Information H.1 General; Book 7; HG22

October 1971
Statistical Correlation of Observed Ground Motion with Low-Rise Building Damage: Project Rulison
JAB-99-87; Historical Information H.6 Seismic/Ground Motion Activity; Book 3; HSG 14
September 1971
Environmental Aspects of Natural Gas Stimulation Experiments with Nuclear Devices 
UCRL-73429
August 27, 1971

AEC News Release Regarding Small Gas Leak 
Community Relations; Book 1; CR 1

May 17, 1971
The Rulison Project in Retrospect 
Community Relations; Book 1; CR 4
May 1971
Completed and Planned Studies of a Rulison Core Sample 
UCID-15826
April 26, 1971
Project Rulison Off-Site Surveillance Operation for the Flaring Period October 26 - November 3, 1970 
Environmental Protection Agency Reports Book 4; E 21
March 10, 1971
Off-Site Surveillance Activities of the Southwestern Radiological Health Laboratory from July through December 1969
SWRHL-98r
February 1971
Structural Response Studies for Project Rulison 
JAB-99-78; Historical Information H.6 Seismic/Ground Motion Activity; Book 3; HSG 17
February 1971
Project Rulison Post-Shot Information Offsite Radiological Safety Programs-Soils
Historical Information H.3 Post-Event Reports; Book 1; HP 5
January 1971
Project Rulison Post-Shot Investigations Summary of Re-Entry Operations 
PNE-R-45
January 1971
Radiochemical Analyses of Water from Selected Streams and Precipitation Collected Immediately Before and After the Second Production-Test Flaring, Project Rulison
USGS-474-122; PNE-R-56
1971
Preliminary Data Report Project Rulison Off-Site Surveillance Flaring Period October 4-5 1970 
Environmental Protection Agency Reports Book 4; E20
October 8, 1970
Photo Interpretation of Close-in Physical Effects of an Underground Nuclear Detonation 
NVO-1163-TM-23
September 1970
Description of Public Health Service Open File Information for Project Rulison, Production Testing Phase 
Environmental Protection Agency Reports Book 1; E 1
August 28, 1970
Rulison Nocturnal Drainage Study 
Historical Information H.1 General; Book 7; HG 26
August 1970
Some Seismic Results of the US Gasbuggy and Rulison Underground Nuclear Explosions 
PNE-G-66; AWRE O 46/70
August 1970
Seismic Data from Rulison 
Historical Information H.6 Seismic/Ground Motion Activity; Book 3; HSG 13
July 1970
Rulison Animal (and Fish) Results Printout 
Ecological Studies Book 1 ES 2
June 30, 1970
Proposed Radiological Experiments for the Project Rulison Flaring Operation 
Historical Information H.5 Radioactivity; Book 1; HRA 6
May 18, 1970
Public Health Evaluation Project Rulison Production Testing 
SWRHL-96; PHEP-1
May 1970
Project Rulison Summary of Property Damage Complaints and/or Claims
Legal Background; Book 1; L 2
March 31, 1970
Project Rulison Text Of Decision
Legal Background; Book 1; L 1
March 16, 1970
Biological Hazards from Project Rulison March 1970
Dynamic and Static Response of the Government Oil Shale Mine at Rifle, Colorado, to the Rulison Event
AT (29-2) 914; USBM 1001; Historical Information H.1 General; Book 1; HG 4
February 2, 1970
Seismic Monitoring of the Rulison Underground Nuclear Explosion near Rifle, Colorado, on 10 September 1969 February 1970
The Effects of the Rulison Event on Buildings and Other Surface Structures 
PNE-R-21; Historical Information H.6 Seismic/Ground Motion Activity; Book 3; HSG 18
January 14, 1970
Mine Safety Evaluation for Project Rulison-Final Report January 10, 1970
Project Rulison Seismic Motions
PNE-R-18
January 1970
Weather Predictions and Surface Radiation Estimates for the Rulison Event 
ARLV-351-4
January 1970
Project Rulison 1970 Environmental Surveillance Summary Report 1970
Ad Hoc Rulison Review Panel Comments Regarding Re-Entry, and Testing Operations 
Historical Information H.2 Biological Studies; Book 1; HB 2
December 22, 1969
Project Rulison Post-Shot Plans and Evaluations
NVO-61
December 1969
Structural Effects of the Rulison Event    
JAB-99-76; Historical Information H.6 Seismic/Ground Motion Activity; Book 3; HSG16
December 1969
Ad-Hoc Rulison Review Panel Comments Regarding Re-Entry, Gas Reservoir Testing and Flaring 
Historical Information H.2 Biological Studies; Book 1; HB 1
November 21, 1969
 Effects Evaluation Post-Shot Re-Entry Project Rulison  
NVO-1220-128
November 11, 1969
Observed Seismic Data Rulison Event 
NVO-1163-197
November 1969
Project Rulison - Site Evaluation Pre-Shot R-EX Well Test Data
PNE-R-7
October 20, 1969
Off-Site Radiological Surveillance Operation Plan for the Project Rulison Drill-Back and Flaring Programs October 1969
Final Report on Air Force Participation in Project Rulison October 1, 1969
Records of Selected Wells and Springs in the Rulison Project Area, Garfield and Mesa Counties, Colorado
USGS-474-40
September 1969
Test Plan, Field Test FT-60 Radioactivity Sampling for On-Site Inspections August 28, 1969
Radioactivity in the Hydrologic Environment Project Rulison Final Pre-Shot Report  
NVO-1229-108
August 13, 1969
Predictions of Seismic Motion and Close-In Effects Rulison Event
NVO 1163-180
August 1969
Pre-Event Bioenvironmental Safety Survey and Evaluation Project Rulison 
PNE-R-3; Historical Information H.2 Biological Studies; Book 1; HB6
July 28, 1969
Effects Evaluation for Project Rulison
NVO-43; Historical Information H.1 General; Book 1; HG6
June 1969
Project Rulison A Government-Industry Natural Gas Production Stimulation Experiment Using a Nuclear Explosive
NVP-2
May 1, 1969
Safety Panel of Consultants Meeting on Rulison (Harvey Gap Dam) Nevada Operations Office May 1, 1969
Geology and Hydrology of the Project Rulison Exploratory Hole, Garfield County, Colorado
USGS-474-16
April 4, 1969
Effects Evaluation for Project Rulison April 1969
Project Rulison: Pre-Shot Predictions of Structural Effects 
JAB-99-61; Historical Information H.4 Pre-Event Reports; Book 1; HPR 2
March 1969
Project Rulison Contract: AEC, Austral Oil Company, and CER Geonuclear Corporation 
Legal Background; Book 1; L3
February 1969
Project Rulison Definition Plan January 2, 1969
Project Rulison Definition Plan December 9, 1968
Technical Plan Project Rulison March 20, 1968
Geohydrologic Data from the Piceance Creek Basin Between the White and Colorado Rivers, Northwestern Colorado 1968
Considerations in the Development of Criteria for Control of Population Exposures to Radiation From Products Produced by Plowshare Applications April 1959
Assessment of Potential Biological Hazards from Project Rulison 
TID-4500
undated
Chemical and Radiochemical Analyses of Water From Streams, Reservoirs, Wells, and Springs in the Rulison Project Area, Garfield and Mesa Counties, Colorado
USGS-474-67
undated
Economics of Nuclear Gas Stimulation 
Historical Information H.1 General; Book 1; HG 5
undated
Emplacement and Cementing of 10 3/4" Casing to 8701 Feet undated
Environmental Tritium Surveillance for Project Rulison undated
Project Proposal - Evaluation of Tritium and Other Radionuclides in Groundwater in the Areas Surrounding the Sites of Projects Shoal, Dribble, Gnome, Gasbuggy and Rulison 
Hydrological/Geological Studies; Book 1; HGS6
undated
Investigation of Rulison Radioactivity
PNE-R-65
undated
Project Rulison Final Operational Radioactivity Report on the Production Tests undated
Project Rulison Post Shot Well Test Data   
PNE-R-52
undated
Radiological Surveillance Data 
PNE-R-57
undated
Report on Interpretation of Test Data from Project Rulison in the Rulison Field, Garfield County, Colorado undated
Rulison Map undated
Summary of Project Rulison undated
Historical documents may contain links to outside sources.
LM cannot attest to the accuracy of information provided by these links.
Please see the Privacy and Security page for more details.
 

 


Last Updated: 5/1/2014