Rocky Flats Plant,
Nonnuclear Production Facility
HAER No. CO-83-L (Rocky Flats Plant, Building 444 and Plant A)
Location:
Rocky Flats Environmental Technology Site, Highway 93,
Golden, Jefferson County, Colorado. Building 444 is located south of Cottonwood
Avenue, directly east of Building 460, and west of Seventh Avenue.
Date of Construction: 1953.
Fabricator: Austin Company, Cleveland, Ohio.
Present Owner: U.S. Department of Energy (DOE).
Present Use: Depleted Uranium Manufacturing.
Significance:
This building is a primary contributor to the Rocky
Flats Plant historic district, associated with the U.S. strategy of
nuclear military deterrence during the Cold War, a strategy considered of major importance
in preventing Soviet nuclear attack. Building 444, one of the first four buildings
constructed at the Rocky Flats Plant, was the primary nonnuclear manufacturing
facility. Manufacturing processes in this building fabricated weapons components and
assemblies from a variety of materials, including depleted uranium, beryllium, stainless
steel, aluminum, and vanadium. Building 444 remained in production until 1994.
Project Information:
In 1995, an inventory and an evaluation was
conducted of facilities at the Rocky Flats Plant for their potential eligibility for
listing in the National Register of Historic Places. The primary goal of this
investigation was to determine the significance of the Cold War era facilities at the
plant in order to assess potential effects of the long-term goals and objectives of DOE. These goals and objectives have not yet been formalized, but include waste cleanup
and demolition activities. Recommendations regarding National Register of Historic Places
eligibility were developed to allow DOE to submit a formal determination of
significance to the Colorado State Historic Preservation Officer for review and
concurrence and to provide for management of historic properties at the plant.
From this determination and negotiations with the Colorado State Historic Preservation
Officer, the Advisory Council, and the National Park Service, a Historic American
Engineering Record project began in 1997 to document
the plants resources prior to their demolition. The plant was listed on the National
Register of Historic Places in 1997. The archives for the Historic American Engineering
Record project are located in the Library of Congress in Washington, D.C.
Introduction:
The plant was one of 13 DOE facilities that constituted
the Nuclear Weapons Complex, which designed, manufactured, tested, and maintained weapons
for the U.S. arsenal. The plant was established in 1951 to manufacture triggers for use in
nuclear weapons and to purify plutonium recovered from retired weapons. The trigger
consisted of a first-stage fission bomb that set off a second-stage fusion reaction in a
hydrogen bomb. Parts were formed from plutonium, uranium, beryllium, stainless steel, and
other materials.
A tense political atmosphere both at home and abroad during the Cold War years drove
U.S. weapons research and development. By the 1970s, both the U.S. and the Soviet Union
maintained thousands of nuclear weapons aimed at each other. These weapons were based on
submarines, aircraft, and intercontinental ballistic missiles. Both the North Atlantic
Treaty Organization and Warsaw Pact countries in Europe had small nuclear warheads known
as theater weapons used as part of the Mutually Assured Destruction program. (The Mutually
Assured Destruction program acted as a deterrent in that if one side attacked with nuclear
weapons, the other would retaliate and both sides would perish.) The final nuclear weapons
program at the plant was the W-88 nuclear warhead for the Trident II missile. This mission
ended in 1992 when President Bush canceled production of the Trident II missile.
The plant was a top-secret weapons production plant, and employees worked with a
recently man-made substance, plutonium, about which little was known concerning its
chemistry, interactions with other materials, and shelf life. The Historic American
Engineering Record documentation effort focused on four aspects of the plant and its role
in the Nuclear Weapons Complex; manufacturing operations, research and development, health
and safety of workers, and security.
| Chronology of Building 444: |
| 1951 |
Construction began on Building 444. |
| 1953 |
Manufacturing operations began. Historic names include Building 44 and Plant A.
Initial manufacturing operations were devoted to the manufacturing of depleted uranium
weapons components. |
| Building 446, a guard post associated with the nonnuclear manufacturing complex, was
completed. |
| 1954 |
Beryllium research and development scale operations began in Building 444. |
| 1955 |
Radiography vaults were added to Building 444. |
| 1956 |
Building 447 was added to the southwest corner of Building 444 to provide manufacturing
space, an assembly area, and a waste processing area. Heat furnaces were installed to
anneal depleted uranium parts. |
| 1957 |
Building 445 was added to the east side of Building 444 to house the carbon shop, which
supplied graphite molds and crucibles to Building 444 and 776 foundries, and the graphite
storage and cutting areas. |
| Building 883 was constructed. Uranium ingots were cast in Building 444, transferred to
Building 883 for further processing, and then returned to Building 444 for final machining. |
| 1958 |
Building 450, an exhaust plenum, was completed. Full-scale beryllium fabrication
(machining) operations began. AeroTech ventilation systems
were installed at each machine. |
| 1960s |
Beryllium operations included casting and shaping. |
| 1962 |
Building 448 was added to the north side of Building 447 to house production
control activities for the Building 444 Complex. Beryllium wrought process (casting and forming)
was developed. |
| 1964 |
Installation of a central AeroTech system in the basement
of Building 444 replaced the initial ventilation system. |
| 1966 |
Uranium-niobium alloying research and development began,
using an electron beam
furnace. |
| 1968 |
Zero Power Plutonium Reactor Project began. |
| 1969 |
Building fire (depleted uranium). |
| 1973 |
Building 453, used for storage of tools, fabricated weapon parts, and raw materials was
completed. |
| 1974 |
AeroTech system replaced with an overhead duct system,
external chip cyclone, and a high efficiency particulate air filter in the exhaust
systems. |
| 1975 |
Building 457, used for graphite storage, was completed. |
| Mid-1970s |
Full-scale production of uranium-niobium alloys began after the installation
of an arc furnace. |
| 1976 |
Beryllium was supplied from off-site contractors; foundry casting (wrought process)
ceased. |
| 1980 |
Foundry cleaned of all beryllium; associated equipment removed. |
| 1981 |
Production plating laboratory became operational. |
| 1986 |
Beryllium ventilation system was upgraded to include two sets of high efficiency
particulate air filters and high and low vacuum systems for fine and heavier
particulates. |
| 1978 |
Titanium stripping operations began. |
| 1989 |
Uranium foundry was shut down. |
| 1990 |
A fire occurred in the coating room of the production plating lab; plating
laboratory was shut down. |
| Process operations were ceased. |
| 1992 |
Building awaited decontamination and decommissioning. |
Building History:
Originally called Plant A, Building 444 was one of the
first buildings constructed at the plant. Building 444 was the primary nonnuclear
manufacturing facility at the plant. Manufacturing processes completed in this complex
were used to fabricate weapons components and assemblies from a variety of materials,
including depleted uranium, beryllium, stainless steel, aluminum, and vanadium.
The production equipment located in Building 444 was used to support war reserve,
special orders, and manufacturing development. Operations included casting,
machining, heat treating, welding, brazing, chemical milling, plating, coating, and
testing and inspection of weapons components made of depleted uranium, depleted uranium
composites, beryllium, stainless steel, and ferric metals. Each material required
different processing techniques.
When expansion of the plant, called Part IV, took place in 1956 and 1957, additions
were made to Building 444. The expansion was motivated by changes in trigger design and
subsequent increased fabrication requirements.
Building Description:
Building 444 is constructed of poured, reinforced
concrete. A portion of the building has a second floor and a basement (112,900 square feet
on the ground floor; 23,700 square feet in the basement; and 25,400 square feet on the
second floor and mezzanines). Design elements include cast-in-place concrete
superstructure with interior columns, exterior walls with monolithic columns, and elevated
floor and roof slabs with monolithic beams and girders. Additionally, some of the interior
firewalls are reinforced concrete with monolithic columns.
The roof is flat with short parapet walls. Roofing is built-up over rigid insulation
with gravel ballast. The exterior walls initially had window openings. With the exception
of a lunchroom, the wall openings are covered with asbestos-cement sheets or filled with
concrete masonry units. Interior partition walls are concrete masonry units or gypsum
board. In special environmentally controlled areas, interior partition walls are composite
laminates with rigid insulation panels. Bridge cranes and monorails were installed
throughout Building 444; most are out of commission.
Within Building 444, there are three designated areas: the open access area, the
radiological control area, and the beryllium control area. The open access area was not
subject to any administrative controls. The radiological control area was a management
control area, within which personnel were required to wear personal protective equipment
to shield against radiation exposure and dosimeters to record radiation exposure. Over one-half of the original building is contained within the radiological control area. There are
no physical barriers between the open access area and the radiological control area. The
smallest designated area is the beryllium control area. This area is equipped with
separate ventilation control systems to control the release of beryllium dust. This area
is separated from the other areas by physical barriers.
The original building area contains a foundry and numerous shops and laboratories.
Shops within the original portion of the building include depleted uranium, beryllium, and
carbon (graphite) machine shops; and heat treating, coating, tool grinding, welding and
brazing, and building maintenance shops. A portion of the precision shop is also housed in
this building. Laboratories include pressure and leak-testing, plating, precision
measuring, and nondestructive testing laboratories. Some of the former shop areas have
been converted into storage areas for excess tools and materials.
Two x-ray vaults and a portion of the precision shop are located west of the original
portion of Building 444. The walls of the x-ray vaults are 4-foot-thick concrete with
labyrinth-type entryways. The tops of the vaults are open to the building roof.
The remaining portions of the precision shop and the calibration laboratory are located
west of the x-ray vaults. Construction and design elements include reinforced-concrete
exterior walls and steel interior columns and roof framing. Three below-grade utility
tunnels run north-south beneath this area.
Rooms 180C and 179, located on the southern side of the western end of the building,
are oil storage areas. Rooms 180C and 179 are additions to the original building
configuration. Room 179 is within the radiological control area.
A receiving and stock storage area for the precision shop, Room 148C, is located on the
north side of the building. Mechanical utility equipment is stored immediately west of
Room 148C, in Room 148D.
The area east of the original portion of Building 444 was open, with a rail spur
alongside the building. This area was later enclosed to contain an inspection laboratory
for the tool grind shop, a tool storage room, and a corridor.
The open access side of Building 444 houses the tool and gauge shop, the tool grind
shop, the erbia coating lab, a carbon shop, and administrative areas. Specialized graphite
molds and crucibles needed in the foundry were produced in the carbon shop. The tool and
gauge, tool grind, and carbon mold producing shops supported plant-wide manufacturing
efforts.
The building utility systems include process and domestic water, process and sanitary
waste, and air supply and exhaust systems. Plant air, house vacuum, instrument air, steam
heating, and cooling water systems are contained within the building. Most of the utility
systems have been significantly upgraded since the original construction of the building.
All mechanical and electrical utility equipment is contained in the basement or on the
roof. A grid of lightning rods and ground cables provide lightning protection.
The beryllium machining area is equipped with specialized ventilation equipment that
has undergone several replacements. When beryllium operations first began in 1958, this
ventilation equipment consisted of AeroTech cyclone separator
units placed at each machine to filter airborne beryllium at the point of generation.
These units' exhausts were connected to the main building exhaust that served the uranium
areas. This first system was replaced in 1964 by a central AeroTech
system that was connected to the main building exhaust. This second system was arranged
so that each machine's local ventilation went through a drop box to collect heavier
debris, through the central plenum, and finally through a single bank of high-efficiency
particulate air filters prior to exhaust. The AeroTech system
was replaced in 1974. The replacement system consisted of an overhead duct system that led
to an external chip cyclone and a high-efficiency particulate air filtration unit. This
system was upgraded again in 1986 to include two stages of high-efficiency particulate air
filtration. This last and final upgrade included two types of conveyance systems: a
low-vacuum system to carry fine particulates, and a high-vacuum system to carry heavier
particulates.
Building Complex: Building 444 is part of the nonnuclear manufacturing complex. Buildings associated
with the nonnuclear manufacturing complex include Building 427, an emergency generator;
Building 446, a guard post; Building 445, carbon storage; Building 447, manufacturing of
depleted uranium; Building 448, depleted uranium material storage; Building 449, carpenter
and paint shop storage; Building 450, an exhaust plenum; Building 455, a plenum; and
Building 453, a storage area. Buildings 445 and 447 are pre-engineered, single-story metal
buildings attached to Building 444. The complex, as a whole, covers 178,340 square feet,
of which 35,200 square feet is open-access and 143,120 square feet is within a
radiological control area. The radiological control area portion of the complex includes part of Building 444
(108,800 square feet), Building 447 (25,820 square feet of floor space), and Building 448
(3,720 square feet of floor space). The radiological control area portions of the complex
house equipment that was used for processing depleted uranium, beryllium, and other
metals.
Building Operations:
Each operational area within Building 444 was designed
to facilitate a systematic flow of material, primarily depleted uranium and beryllium.
Building operations included foundry processes, fabrication and assembly of parts, testing
and inspection of fabricated products, and support operations. Coating and plating
operations were conducted on materials from Building 460 (outside the Building 444 flow of
materials). Other operations within Building 444 included special projects.
Foundry Process:
Depleted uranium ingots (arc-cast, induction cast, and alloys), beryllium ingots, and
aluminum shapes were produced in the foundry.
Depleted Uranium Casting: During the initial research and development period (1951-55), depleted uranium was
shipped to the plant as derby-shaped parts from the Gaseous Diffusion Plant in Paducah,
Kentucky, and later as ingots from the Feed Materials Production Center in Fernald, Ohio.
The plant foundry cast ingots of depleted uranium from virgin depleted uranium, scrap
depleted uranium, depleted uranium alloys, silver, aluminum, and copper. The metals were
placed in crucibles, loaded into one of eight induction furnaces and melted in a vacuum
atmosphere. Induction casting used radio frequency energy to melt the metal, which was
poured into graphite molds to form ingots. Depleted uranium casting operations ceased in
1988.
Beryllium Casting: Casting of beryllium (beryllium wrought process) began in 1962, and involved a number
of processes and buildings. Beryllium was received in the form of bar stock prior to
development of the wrought casting process. The beryllium wrought process was a
complicated process whereby beryllium ingots were cast in Building 444, then transferred
to Building 881 to be canned (encased) in stainless steel (the canning process was used to
aid the subsequent rolling process, as beryllium is very brittle). Canned beryllium was
transferred to Building 883 to be heated and rolled to the required thickness. The
stainless steel was cut away after rolling, and the resulting beryllium sheets were
pressed into the required shapes and transferred back to Building 444 for machining. The
beryllium foundry ceased operation when the wrought process was discontinued in 1975, and
was replaced by the purchase of sintered (pressed powder) beryllium blanks from off-site
vendors.
Fabrication: Fabrication operations in Building 444 included machining of beryllium and depleted
uranium. Tools used during machining operations included engine lathes, mills, turning and
milling machines, electrical-discharge-machining equipment, and chemical-machining
equipment. Individual machining operations were divided into two areas: beryllium and
depleted uranium. A negative air pressure was maintained in fabrication areas to prevent
the spread of contaminated dust into other areas.
Beryllium Fabrication: Beryllium machining operations were conducted on bar stock (1958-62), beryllium
castings (1962-75), and sintered forms (1975-93). The machining process included sawing,
milling, drilling, and lathe operations. If needed, the pieces were then polished and
abraded. Chemical milling of fabricated beryllium parts occurred in Room 203 of Building
444. Site returns (weapons returned to the plant for reprocessing, upgrade, or retirement)
that contained beryllium were returned to the Building 444 beryllium machining area to be
dismantled. Beryllium machining operations continued until 1993. Ingots and semi-finished
and finished beryllium parts were heat treated in the induction furnace located in Room
403 of Building 447. Beryllium machining operations were conducted in isolated rooms containing independent
air filtering systems. A number of systems have been used in Building 444 to filter
airborne beryllium, to maintain a negative air pressure in the beryllium work areas, and
to prevent the spread of beryllium dust.
Depleted Uranium Fabrication: Prior to the construction of Building 883 in 1956, final machining of depleted uranium
took place in Building 444. After 1956, the uranium ingots were cut into slices (rolling
pucks) in Building 444 and shipped to Building 883. There the pucks were rolled and formed
into their initial shape and transported back to Building 444 for final machining. Machining of depleted uranium was conducted in Room 101. Metal parts containing
depleted uranium, depleted uranium alloy, and depleted uranium with traces of iron,
silica, titanium, aluminum, or stainless steel were cut in the depleted uranium machining
process. Machining operations included turning, facing, boring, milling, and sawing.
Ingots and semi-finished and finished depleted uranium parts were heat treated in the
induction furnace located in Room 403 of Building 447.
In 1956, the chip roaster in Building 447 became operational. Depleted uranium chips
recovered from machining areas were collected in covered 55-gallon drums, transferred to
Building 447, and burned to an oxide (a more stable form) under controlled conditions in
the chip roaster. The oxides were packaged and shipped off site for disposal.
Assembly:
Assembly operations included cleaning, brazing, welding, assembly etching, metallic
coating, weighing, and leak testing. Component parts and partially assembled weapon
components (subassemblies) from Building 444 were shipped to the final weapon assembly
areas (Buildings 991, 777, and 707, depending upon the time frame) for use in finished
trigger assemblies. Weapons components and assemblies were also shipped directly to the
Y-12 Plant located on the Oak Ridge Reservation in Tennessee and the Pantex Plant in
Amarillo, Texas.
Uranium, beryllium, and stainless steel parts were cleaned prior to welding, brazing,
and coating. Deionized water, isopropyl alcohol, ethyl alcohol, and Oakite were among the materials used to clean fabricated parts.
During assembly, parts underwent one or more welding or brazing operations. Assembly
welding processes included tungsten inert gas, electron beam, tungsten inert gas crimp
welding, electron bombardment, and vacuum furnace brazing. Materials welded included
beryllium parts, depleted uranium, and other source materials.The electron beam welder joined parts made of beryllium with parts made of other
materials. The brazing operations used rings and wires of various filler metals and a flux
to join like and unlike materials. Electron bombardment brazing was conducted using a bell
jar and vacuum pump arrangement. Vacuum furnace brazing was performed in a furnace
chamber.
Assembly etching was performed prior to assembly coating. Uranium parts were acid
etched using an ultrasonic etching bath. Subsequently, uranium parts were coated with
silver using a hot-hollow cathode chamber and titanium vapor deposition coatings were
applied using a vacuum coating chamber.
Testing and Inspection: In-process and final inspections were performed for quality assurance on all products
generated in the Building 444 Complex. This included special order and regular production
components, subassemblies, graphite molds, and cutting tools from tool grinding.
Inspection equipment included fixed, open setup, and machine gauging. Testing and
inspection activities included assembly testing, nondestructive testing, and product
inspection.
Assembly Testing: Assembly testing included a variety of operations to determine product integrity and
conformance to design specifications. Test procedures included one or more of the
following: leak and pressure tests, weight determination, crimping or swaging, and
electromarking.
Nondestructive Testing: Test methods included radiography, ultrasonic inspection, weight and density
measurement, and dye penetrant inspection. Radiographic testing (also referred to as beta
back scattering) used x-rays to detect internal flaws (i.e., cracks, lack of fusion, and
inclusions) in parts and subassemblies. Ultrasonic inspection (also referred to as eddy
current inspection) was used to detect voids and other defects in welded joints of parts
and subassemblies. Dye penetrant testing used dye penetrant oil to detect surface cracks
and other defects in parts and subassemblies.
Product Inspection: Product inspection, used to provide quality assurance for parts fabricated in the
building or purchased off site, consisted of a series of cleaning and non-dimensional
inspection processes to determine the dimension of machined parts and conformance to
design specifications.
Coating and Plating:
Coating and plating operations were performed on nonnuclear parts such as stainless
steel and copper. These parts were not fabricated in Building 444, rather, they were
fabricated in Building 460 (stainless steel and nonnuclear component manufacturing).
Coating: Nonnuclear parts fabricated in Building 460 were coated with erbium oxide. In
preparation for coating, the parts were grit-blasted, ultrasonically cleaned, rinsed, and
dried. The parts were then coated with erbium nitrate, dried, and heat-treated. The
heat-treating decomposed the erbium nitrate to erbium oxide. The spray and heat processes
were repeated as necessary. Residual spray was removed using a silicon grit blast.
Plating: War reserve and special order parts fabricated from copper, steel, and stainless steel
were etched and plated. Various plating tanks containing different plating solutions were
used, including: silver plating, sulfuric etch, nickel plating, alkaline cleaner, and
electroless nickel-plating tanks.
Support Operations:
Non-production operations included production control, certification, tool engineering,
tool grinding, tool/gauge fabrication (precision shop), tool and gauge inspection,
development and application of plating techniques and materials, and graphite mold
fabrication.
Special Projects:
The plant conducted special order work for other facilities in the weapons complex, the
Department of Defense, or to fulfill the needs of other federal departments or agencies.
Most of the special order work at the plant did not involve materials outside those used
in regular production activities. Most of the special order work was relatively
short-lived. One exception to this was the Zero Power Plutonium Reactor project.
Zero Power Plutonium Reactor Project: From 1967 to 1968, the plant manufactured approximately 4,000 stainless steel-clad fuel
elements consisting of plutonium, molybdenum, and uranium. The fuel rods were manufactured
for installation in a reactor at the Argonne National Laboratory. The Zero Power Plutonium
Reactor fuel elements were manufactured by alloying uranium and molybdenum in Building
444. The alloy was then sent to Building 771, where it was alloyed with plutonium, and
then clad in stainless steel envelopes in Building 776/777.
Other Special Projects: Other known special projects conducted in Building 444 included cadmium rolling and
forming research and development operations; beryllium research and development work using
tetrabromoethylene for float/sink tests from 1968 to 1972; and machining of lithium salts,
using processes similar to those used in uranium machining.
Operations Since 1989:
After nuclear weapons components production ceased at the plant in 1989, fewer and
fewer components were produced in Building 444 each year. Manufacturing continued in the
building until 1994. By the end of 1994, Building 444 was idle, awaiting the
decontamination and decommissioning process.
Sources:
Colorado Department of Health. Project Tasks 3 & 4 Final Draft
Report. Reconstruction of Historical Rocky Flats Operations and Identification of Release
Points (1992), by ChemRisk. Rocky Flats Repository. Golden, Colorado.
Coven, Walter, employed at the plant by the site contractor for 33 years. Personal
communication, January 1998.
Swenson, Peter, employed at the plant by the site contractor since 1982. Personal
communication, December 1997.
United States Department of Energy. Public Affairs. n.d. Rocky Flats Information.
Nuclear Weapons Complex. Golden, Colorado: U.S. Department of Energy, Office of
Communications and Economic Development.
United States Department of Energy. Final Site Safety Analysis Report - Building 444
(1982), by Rockwell International. Rocky Flats Repository. Golden Colorado, 1982.
United States Department of Energy. Historical Release Report (HRR) (1994), by
EG&G. Rocky Flats Plant Repository. Golden, Colorado, 1994.
United States Department of Energy. Final Cultural Resources Survey Report (1995), by Science Applications International Corporation. Rocky Flats Repository. Golden,
Colorado, 1995.
Historians:
D. Jayne Aaron, Environmental Designer,
engineering-environmental Management, Inc. (e²M), 1997. Judith Berryman, Ph.D.,
Archaeologist, e²M, 1997.
Index to Photographs
Located south of Cottonwood Avenue, west of Seventh Avenue, and east of B460, Golden Vicinity, Jefferson County, Colorado.
Photographs CO-83-L-1 through CO-83-L-20 were taken by various site photography
contractors, dates are indicated in parentheses.
CO-83-L-1 – View looking northwest at Building 444 under construction. Originally called Plant A, Building 444 was one of the first buildings constructed at the Rocky Flats Plant. (4/15/52)
CO-83-L-2 – View looking northeast at Building 444 under construction. Building 444 was the primary non-plutonium manufacturing facility at the Rocky Flats Plant. Manufacturing processes completed in this building were used to fabricate weapons components and assemblies for a variety of materials, including depleted uranium, beryllium, stainless steel, aluminum, and vanadium. (4/25/52)
CO-83-L-3 – View of addition to Building 444. In the mid 1950s, radiography vaults, a graphite storage and cutting area, and a graphite production processing area were added to Building 444. (1956)
CO-83-L-4 – View looking southeast at Building 444. (1/1/98)
CO-83-L-5 – View looking northwest of Building 444. (1/1/98)
CO-83-L-6 – View of inside of rail car containing graphite delivered to Building 444. The graphite was formed into molds and crucibles for use in the foundry. (1/12/54)
CO-83-L-7 – View of the chip roaster located in Building 447. The chip roaster burned uranium chips from machining areas to an oxide, a more stable form for disposal. (4/27/55)
CO-83-L-8 – View of radiography equipment. Test methods included radiography and beta backscattering. (7/13/56)
CO-83-L-9 – View of foundry furnace. Depleted uranium ingots, beryllium ingots, and aluminum shapes were produced in the foundry. (10/30/56)
CO-83-L-10 – View of depleted uranium ingot and mold in foundry. (11/11/56)
CO-83-L-11 – View of depleted uranium ingot. The metals were placed in crucibles, loaded into one of eight induction furnaces and melted in a vacuum atmosphere. (11/11/57)
CO-83-L-12 – View of depleted uranium ingot and molds. Depleted uranium casting operations ceased in 1988. (11/14/57)
CO-83-L-13 – View of Sheffield Gauge, used to measure roundness of weapon parts, as part of the final parts inspection process. (6/2/67)
CO-83-L-14 – View of vacuum coating chamber. The system used titanium vapors to deposit titanium coating onto uranium parts under a vacuum. (1/11/83)
CO-83-L-15 – View of the special shrouding and air handling system used in beryllium production. (3/30/89)
CO-83-L-16 – View of plant fabricated equipment in the coatings laboratory. A mass spectrometer is to the left of the photo. (6/23/89)
CO-83-L-17 – View of equipment burned in a titanium fire. (11/13/89)
CO-83-L-18 – View of engineering controls used in the beryllium shop to reduce employee exposure. The lathe is covered by a hood with a separate air-handling system. Precision equipment is controlled digitally. (11/13/89)
CO-83-L-19 – View of the plating baths and control panels. Gold and silver were among the materials plated onto parts made of copper, stainless steel, and steel. (11/15/89)
CO-83-L-20 – View of the waste storage tanks associated with the plating laboratory. (11/15/89)
CO-83-L-21 – View of the first floor plan. The original drawing has been archived on microfilm. The drawing was reproduced at the best quality possible. Letters and numbers in the circles indicate footer and/or column locations.
CO-83-L-22 – View of the basement and mezzanine floor plans. All mechanical and electrical utility equipment is contained in the basement. The mezzanine contains offices. The drawing was reproduced at the best quality possible. Letters and numbers in the circles indicate footer and/or column locations.
CO-83-L-23 – View of section drawings. The section lines for A-A and C-C cut the building east-west; section line B-B cuts the building north-south. The original drawing has been archived on microfilm. The drawing was reproduced at the best quality possible. Letters and numbers in the circles indicate footer and/or column locations.
CO-83-L-24 – View of the Building 447 and 448 additions. The drawing was reproduced at the best quality possible. Letters and numbers in the circles indicate footer and/or column locations.
 |