|
Rocky Flats Plant, Plutonium Laboratory
HAER No. CO-83-C (Rocky Flats Plant, Building 779)
Location:
Rocky Flats Environmental Technology Site, Highway 93, Golden, Jefferson
County, Colorado. Building 779 is in the north-central section of the industrial area of
the Rocky Flats Plant.
Significance:
This building is a secondary contributor to the Rocky Flats Plant
historic district, associated with the U.S. strategy of nuclear military deterrence during
the Cold War, a strategy considered of major importance in preventing Soviet nuclear
attack on the U.S. In the early 1960s, the Rocky Flats Plant became the sole producer of
plutonium triggers and research and development activities increased markedly.
Laboratories were established for each of the three manufacturing buildings, specializing
in the material of the plant, either plutonium, enriched uranium, or depleted uranium.
Building 779 was built to provide additional research and development capabilities to
support plutonium production and recovery processes.
Description:
Building 779 is an irregular-shaped, two-story, flat-roofed building
constructed of concrete block on concrete footings. A one-story, metal-sided ell extends
to the north. The doors are steel or steel with safety glass; the windows, on the south
wall only, are single panes in metal sash. There is a second floor passage to Building
776/777 (plutonium fabrication and assembly) on the west side. Building 779 has nearly
doubled in size since it was built in 1965, with two major additions in 1968 and 1973. The
first addition, the larger of the two, provided office and laboratory space, plus an
environmental storage facility for product aging studies under various environmental
extremes, and a storage vault. A filter plenum facility (Building 729) was also
constructed in 1973 next to Building 779 and linked by a second-story bridge for the
ducting. The new plenum facility served as the second addition to the main building and
housed an emergency generator. A year later, a new filter plenum facility was added to the
east end of Building 779 to serve the original building and that portion added in 1968. A
structural upgrade was completed in 1988 to provide added resistance to damage from
earthquakes and high winds. The building is 67,710 square feet.
History:
In the early years of nuclear weapons production at the Rocky Flats Plant,
most of the research and development functions were handled by the three laboratories
associated with the Nuclear Weapons Complex: Los Alamos National Laboratory in New Mexico,
Lawrence Livermore Laboratory in northern California, and Sandia National Laboratory in
New Mexico and California. Any research done at the Rocky Flats Plant was incorporated
into production engineering for new weapons design. When the Rocky Flats Plant became the
sole producer of plutonium triggers (early 1960s), research and development activities and
funding increased markedly. Laboratories were established for each of the three
manufacturing buildings specializing in the material of the plant, either plutonium
(Building 771), enriched uranium (Building 881), or depleted uranium (Building 444).
Building 779 was built in 1965 to provide additional research and development capabilities
to support plutonium production and recovery processes.
The specific purpose of this facility was to gain more knowledge of the chemistry and
metallurgy of plutonium and its interactions with other materials that might be used in
the manufacturing process. Although some of the processes in the building changed over the
years, the primary purpose of the activities did not. Most of the materials used in this
facility were the same as those in the plutonium manufacturing buildings, and much of the
work conducted involved improvement of existing processes and understanding the materials
employed. Research, development, and support operations were divided into five areas of
responsibility: process chemistry technology; physical metallurgy; machining and gauging;
joining technology; and hydriding (plutonium recovery) operations.
The Process Chemistry Technology group supported plant production, manufacturing, and
assembly operations. The process chemistry laboratories engaged in weapons process
development, stockpile reliability testing, testing of various materials compatibilities,
plutonium aging under various environmental conditions, and methods development for
recovering, separating, and purifying actinides from waste streams and residues. The
Physical Metallurgy group, which included tensile testing; study of casting dynamics;
electron microscopy; X-ray analyses; hardness testing; and dimensional dynamics; conducted
research on various metals, alloys, and material required by plant missions. This group
also supported different research groups, design agencies, plant production, and other
metallurgy studies. The Machining and Gauging group, which involved manufacturing of
special order parts and test components, had two shops and a laboratory for tool making,
maintenance operations, and high-precision machining for special orders and tests. The
Joining group, which involved methods such as welding and brazing, developed sophisticated
joining techniques for nuclear materials.
Building 779 was also used to find new ways to recover plutonium and associated
actinides. The Hydriding group was involved in plutonium recovery experiments. During
plutonium processing, significant amounts of plutonium would coat on metallic and
non-metallic substrates such as crucibles, tools, and equipment. These crucibles needed to
be re-used in certain operations. For many years, the sole method available for recovery
of plutonium from these substrates was acid dissolution, which in some cases damaged the
substrate. The nonaqueous hydriding process was developed in order to effectively remove
and recover plutonium without damage to the substrates. In addition to this main
advantage, the hydriding process involved relatively few process operations and generated
very little waste. These features resulted in fewer material accountability problems and
reduced the potential for personnel radiation exposure. It was soon discovered that
plutonium could also be recovered from non-valuable or discardable substrates. A decision
was made in early 1971 to design a production prototype hydriding apparatus. The prototype
hydriding apparatus was constructed in Building 779A and went on line in April 1972.
Research in Building 779 also improved the pyrochemical process for plutonium
purification, one of the main plutonium recovery operations. Pyrochemical processing
included molten salt extraction and electrorefining processes. Molten salt extraction and
electrorefining were used for plutonium recovery from site return materials and scraps,
while other processes were used for recovery from residues and oxides. As much plutonium
as possible was recovered from site returns (dated weapons) and manufacturing scraps,
since the material was extremely expensive, difficult to obtain, and highly controlled for
national security reasons.
Sources:
Colorado Department of Health. Project Tasks 3 & 4 Final Draft
Report. Reconstruction of Historical Rocky Flats Operations and Identification of Release
Points (1992), by ChemRisk. Rocky Flats Repository. Golden, Colorado.
Crisler, L. R. 1991. "Rocky Flats Plant Plutonium Recovery Reference
Process," for EG&G Rocky Flats, Inc.
Rocky Flats Repository. Golden, Colorado.
Stakebake, Jerry, Plutonium Metal Researcher in Building 779 of the Plant, began
employment with the site contractor in 1965. Personal communication, January 22, 1997.
United States Department of Energy, Public Affairs, n.d. Tour Information. Rocky
Flats Facilities. Golden, Colorado:
U.S. Department of Energy, Office of
Communications and Economic Development.
United States Department of Energy. Final Safety Analysis Report, Building 779
(1990), by EG&G Rocky Flats, Inc.
Rocky Flats Repository. Golden, Colorado,
1990.
United States Department of Energy. Final Cultural Resources Survey
Report (1995), by Science Applications International Corporation. Rocky Flats
Repository. Golden, Colorado, 1995.
Historians:
D. Jayne Aaron, Environmental Designer, engineering-environmental
Management, Inc. (e2M), 1997. Alexandra Cole, Architectural Historian.
Science Applications International Corporation, 1997.
Index to Photographs
Located in the north-central section of the industrial area at 79 Drive, Golden Vicinity, Jefferson County, Colorado.
Photographs from the Rocky Flats Environmental Technology Site Archives,
Rockwell International, site photography contractor, January 5, 1977.
CO-83-C-1 – View of a portion of the hydride processing laboratory. Operations in the glove box in the background of the photograph included hydriding of plutonium and hydride separation. In the foreground, the vacuum monitor control panel measured temperatures within the glove box. The center control panel regulated the furnace inside the glove box used in the hydriding processes. This equipment was essential to the hydriding process, as well as other glove box operations.

|