Silos
1 and 2 Project
Remove 8,900 cubic yards of high activity low-level waste from two concrete silos, treat
the waste by chemical stabilization and ship off site for disposal.
silos1&2 |
 |
Silo
3 Project
Remove 5,100 cubic yards of low-level waste from concrete
silo and ship off site for disposal.
silo 3 |
 |
Waste
Pits Project
Remediate the contents of six waste pits
ranging in size from a baseball diamond to a
football field and varying in depth from 13
feet to 30 feet.
wpp |
 |
Off Site Waste Disposition
Transfer soil and debris off site for
disposition.
oswd |
 |
Soil
and Disposal Facility Project
Remediate the contents of six waste pits
ranging in size from a baseball diamond to a
football field and varying in depth from 13
feet to 30 feet.sdfp |
 |
Decontamination & Demolition
Dismantle over 259 former production plants, support structures
and associated components. d&d |
 |
Aquifer
Restoration Project
Remediate contaminated portions (approximately 170 acres) of the Great Miami
Aquifer, one of the largest sole-source aquifers in the nation.
aquifer |
 |
Waste
Management Project
Characterize, sample, package and dispose of low-level
radioactive, hazardous and mixed waste.
waste |
 |
Nuclear Material Disposition
Project
Completed disposition of 31 million
pounds of nuclear product.. nmd |
 |
Restoration
Project
Ecological restoration of 900 acres
of the site.
rest |
|
 |
Cleanup Highlights
Summary of noteworthy events from
1984 to the present
highlights |
 |
Environmental Monitoring
Collect water, sediment,
and air samples to assess the
impact of site cleanup activities on the environment.
monitoring |