Plant 5 Decontamination & Dismantlement Project
August 2000 Photo Tour 

Previous Home Next

Asbestos Workers use glove bags to contain friable asbestos while removing the material.
6401D-592

Asbestos Workers use glove bags to contain friable asbestos while removing the material.

 

Plant 5, the Metals Production Plant, received uranium tetrafloride (UF4) from Plant 4 and the Pilot Plant. The UF4 was blended with magnesium granules and heated in furnaces to produce uranium metal. The D&D of Plant 5 will consist of surface decontamination, building and equipment dismantlement, size reduction of building material and the containerization of all construction debris. The project is expected to be complete by May 2001.

Archives | Enhanced Permanent Leachate Transmission System | | Plant 5 D&D | Plant 6 D&D | Security/Industrial Relations | Silos 1 & 2 Accelerated Waste Retrieval | Silo 3 Remediation | Southern Waste Units | WPRAP

Page 3

Navigation Bar

Together, DOE and Fluor Fernald were committed to safely restoring the 
Fernald site to an end state that serves the needs of the community.