LM Site Map
Emergency Contact Numbers:
(970) 248-6070 or (877) 695-5322
LM Home > LM Sites > Considered Sites > Project Gas Buggy Site - NM 14

FUSRAP Considered Sites

Site: Project Gas Buggy Site (NM.14 )



Designated Name: 
Alternate Name:
 

Location:  
Evaluation Year:  
Site Operations:  
Site Disposition:  
Radioactive Materials Handled:  
Primary Radioactive Materials Handled:  
Radiological Survey(s):  
Site Status:  



Also see Gasbuggy, New Mexico, Site
Nevada Test Site History

Documents Related to Project Gas Buggy Site
  1. Gasbuggy Site – Underground Nuclear Site Long-Term Monitoring: MEMORANDUM OF UNDERSTANDING between the U.S. Department of Energy Office of Legacy Management; the U.S. Department of the Interior (USDI), Bureau of Land Management, Farmington Field Ollie; and the U.S. Department of Agriculture (USDA), Forest Service, Carson National Forest.
  2. Surface Corrective Action Investigation Report with Surface Corrective Action Plan for the Gasbuggy Site, New Mexico. DOE/NV-908. April 2004
  3. Gasbuggy, New Mexico, Fact Sheet 
  4. Floodplains and Wetlands Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico, December 1993.
  5. Class Cultural Resources Survey of the U.S. Department of Energy Gasbuggy Stimulation Test Site Rio Arriba County, New Mexico, December 1993.
  6. Sensitive Species Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico, December 1993.
  7. Project Gasbuggy Site Restoration Final Report, July 1983.
  8. Surface Radioactivity at the Plowshare Gas-Stimulation Test Sites: Gasbuggy, Rulison, Rio Blanco. Gasbuggy File
  9. Gasbuggy Site Environmental Management End State Vision Final, January 2005.
  10. Gasbuggy Surface Closure Report for the Gasbuggy Site, New Mexico, September 2005.
  11. Interagency Agreement between DOE, BLM, and USDA
  12. June 2009 Groundwater and Surface Water Sampling at the Gasbuggy, New Mexico, Site. LMS/GSB/S00609. October 2009.
  13. June 2011 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site. LMS/GSB/S00611.October 2011
  14. June 2012 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site. LMS/GSB/S00613. July 2013.
  15. June 2013 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site. LMS/GSB/S00613.December 2013.
  16. June 2014 Groundwater, Surface Water, Produced Water, and Natural Gas Sampling at the Gasbuggy, New Mexico, Site. LMS/GSB/S00614 October 2014.
  17. July 2010 Natural Gas and Produced Water Sampling at the Gasbuggy, New Mexico, Site. LMS/GSB/S00710.January 2011
  18. Long-Term Hydrologic Monitoring Program Evaluation Report-Gasbuggy, New Mexico. LMS/GSB/S04019. June 2009
  19. Gasbuggy Site Assessment and Risk Evaluation. LMS/GSB/S05374. March 2011, Rev. 1
  20. Hydrologic and Natural Gas Sampling and Analysis Results for 2009-Gasbuggy, New Mexico. LMS/GSB/S05869. November 2009
  21. Long-Term Surveillance and Maintenance Plan for the Gasbuggy, New Mexico, Site. LMS/GSB/S06433-0.0. October 2018
  22. Gasbuggy, New Mexico, Hydrologic and Natural Gas Sampling and Analysis Results for 2010. LMS/GSB/S07076. December 2010
  23. Gasbuggy, New Mexico, Natural Gas and Produced Water Sampling and Analysis Results for 2011. LMS/GSB/S08153. September 2011
  24. Gasbuggy, New Mexico, Natural Gas and Produced Water Sampling and Analysis Results for 2012. LMS/GSB/S09448. December 2012
  25. Gasbuggy, New Mexico, Natural Gas and Produced Water Sampling and Analysis Results for 2013. LMS/GSB/S10841. December 2013.
  26. Gasbuggy, New Mexico Natural Gas, Produced Water, and Hydrologic Sampling and Analysis Results for 2014. LMS/GSB/S12349. December 2014.
  27. Radionuclide Migration at the Gasbuggy Underground Nuclear Test Site. LMS/GSB/S13226. August 2015
Historical documents may contain links which are no longer valid or to outside sources. LM can not attest to the accuracy of information provided by these links. Please see the Leaving LM Website page for more details.
Last Updated: 12/16/2015