FUSRAP Considered Sites
Site: Project Rio Blanco (CO.0-09)
Eliminated from consideration under FUSRAP
Designated Name: | Not Designated |
Alternate Name: | None |
|
Location: | ~ 52 miles north of Grand Junction, Co. , Rio Blanco County , Colorado | CO.0-09-1
|
Evaluation Year: | 1985 | CO.0-09-1
|
Site Operations: | The project was a cooperative research effort undertaken in 1973 between CER Geonuclear Corp, Continental Oil Co (Conoco), and the US Energy Research and Development Administration Nevada Operations Office (ERDA/NV) to assess the commercial feasibility of using nuclear explosives to recover natural gas from low permeability formations in the Rocky Mountains. | CO.0-09-1
|
Site Disposition: | Eliminated - Radiation levels below criteria | CO.0-09-1
|
Radioactive Materials Handled: | Yes |
|
Primary Radioactive Materials Handled: | None; One Underground Detonation on May 17, 1973 | CO.0-09-1
|
Radiological Survey(s): | Yes - long term and short term hydrologic, gas and water monitoring | CO.0-09-1
|
Site Status: | Eliminated from consideration under FUSRAP |
|
Also see
Rio Blanco, Colorado, Site
Documents Related to Project Rio Blanco
- CO.0-09-1 - Memorandum/Checklist; Jones to the File; Subject: Elimination Report - Project Rio Blanco; October 15, 1985. Attachment: Project Rio Blanco Radiological Summary; Circa 1985.
Historical documents may contain links which are no longer valid or to outside sources. LM can not attest to the accuracy of information provided by these links. Please see the Leaving LM Website page for more details.